Company history:
In 1999 Fuzhou Hailin Machinery Co.Ltd. was founded.
In 2001 Fuzhou Hailin Machinery Co.Ltd. was settled in Liaoyuan Industrial Area
In 2003 Fuzhou Hailin Machinery Co.Ltd. was moved to Jinshan Industrial Area which is 4 times larger than the previous one.
Company Honor:
In 2001 Hailin achieve the ISO9001 certificate
In 2004 Diesel engine generator set and water pump set achieve the CE certificate.
In 2004 HL178FA amp; HL186FA achieve the EPA amp; CARB certificate in USA.
In 2007 HL2500HL4000 series and HL3500SEHL5000SE diesel generator set achieve GS certificate.
In 2007 Hailin generator set series achieve the CE certificate from TUV